Industrial and infrastructure projects

Rehabilitation and extension of sewerage network and accompanying water supply network

"Rehabilitation and extension of sewerage network and accompanying water supply network in Shumen - stage 2 within the project No. DIR 51011116-23-65 integrated water cycle for the city of Shumen - stage 2 - Operational Programme "Environment 2007-2013".

"Rehabilitation and extension of sewerage network and accompanying water supply network in Shumen - stage 2 within the project No. DIR 51011116-23-65 integrated water cycle for the city of Shumen - stage 2 - Operational Programme "Environment 2007-2013".

Β 



Completed are the types of work by parts:

Β 

  • construction works on sewerage branch 3 household;

  • sewer branch 4 mixed;

  • sewer branch 5 mixed;

  • sewer branch 11 split;

  • sewer branch 12 mixed;

  • sewer branch 15 mixed;

  • pusher of PSC 2 - Π€225;

  • profile 561;

  • outflow duct for storm overflow drain 1, 2, 3 and 4;

  • PSC 2;

  • water supply pipeline on bul. Simeon Veliki and Dedeagach str.

  • water supply pipeline parallel branch 15 to IB1;

  • water supply pipeline to PSC 2;

  • earthworks (excavation, embankment, compaction);

  • laying water and sewage pipes

  • construction of sewage pumping station (incl. delivery and installation of equipment); ripping and restoration of road and pavement;

  • total water supply pipeline 5073 m;

  • total sewage 9495 m.

Related projects

Upgrade with three floors and a terrace floor for public service, city of Varna
Public and administrative buildings

Upgrade with three floors and a terrace floor for public service, city of Varna

Upgrade with three floors and a terrace floor for public services over a single storey building in RLP IX-2 in sq. 75, Varna - 2011

Repair of section "3-rd urban highway"
Industrial and infrastructure projects

Repair of section "3-rd urban highway"

Repair of section "3-rd urban highway", 1996